Vehicle access was to be maintained throughout this build.

As a result the scaffolding along one corner could not be built from the ground.

We designed a beam scaffolding sysmtem to cantilever out from the building at this point and built the scaffolding up from it, allowing vehicle access to be maintained underneath.